Skip to main content

Beacon lock-on. Report 18: Guiding beam side guidance of the aircraft He 111 E with running speed control favorable switching values: Influence of the ratio F1: E1, 1942-08-18

 File — Object: 73/1 - 79/18, Folder: Arch 79/18

Dates

  • Creation: 1942-08-18

Extent

From the Collection: 100 Linear feet

Language of Materials

From the Collection: German

General

German Translation: Leitstrahl Aufschaltung. Bericht 18: Leitstrahlseitenfurung des Flugzeuges He 111 E bei Laufgeschwindigkeitssteuerung gunstige Aufschalwerte: Einfluss des Verhaltnisses F1: E1

Author/Editor: Holker Schubert, Steuding

Repository Details

Part of the The University of Alabama in Huntsville Archives & Special Collections Repository

Contact:
M. Louis Salmon Library
301 Sparkman Drive
Huntsville Alabama 35899 United States of America
256-824-6523