Box 8
Container
Contains 48 Results:
Report on the May beetle project Trajectories at different propellant temperatures, 1943-10-13
File — Box: 8, Folder: 50/15
Dates:
1943-10-13
Report on the waterfall project C 2 (8, 45) Forced straight paths to calculate the speed distribution in the firing plane, 1943-11-06
File — Box: 8, Folder: 50/16
Dates:
1943-11-06
to english Report on the waterfall project C 2 (8, 45) Influence of different initial speeds when launching the catapult on the hit range T III of the aggregate C 2-8/45., 1944-02-01
File — Box: 8, Folder: 50/17
Dates:
1944-02-01
Waterfall report Plane follow curves. Target speed 150 m/s., 1944-05-23
File — Box: 8, Folder: 50/18
Dates:
1944-05-23
Report on Waterfall Project C 2 (8.45) Table of numbers for determining the air force coefficients ca and cw in relation to the caliber area for the waterfall project, 1945-01-09
File — Box: 8, Folder: 50/19
Dates:
1945-01-09
Report on Waterfall Project C 2 (8.45) Numerical tables for determining various important variables for the orbital calculation for the waterfall project, 1945-01-09
File — Box: 8, Folder: 50/20
Dates:
1945-01-09
Glider report Number tables for determining the pressure point position H/D as well as the time course of the center of gravity position s/D and the moment of inertia 0 for the glider A 4 V12/c (A4b)., 1945-01-09
File — Box: 8, Folder: 50/21
Dates:
1945-01-09
Status of the development of a circulation chamber - liquid pump 1. (pre-) report, 1941-02-24
File — Box: 8, Folder: 51/1
Dates:
1941-02-24
Problem To Be Solved: Computation of combustion units operating on 75% alcohol and liquid oxygen
File — Box: 8, Folder: 52/2
Dates:
1920 - 1970
Calculation of the flow through a nozzle and the exiting jet
File — Box: 8, Folder: 54/2
Dates:
1920 - 1970