Box 13
     Container 
  
Contains 76 Results:
Control interruptions: Time-varying guide beam switching sizes for aggregate A4, 1943-06-11
     File  — Box: 13, Folder: 86/129
  
        Dates: 
      1943-06-11
    
  
    
  
Control substitution: For the stability investigation of the lateral guide beam guidance, 1943-06-25
     File  — Box: 13, Folder: 86/130
  
        Dates: 
      1943-06-25
    
  
    
  
Control Operations: Explanation of the lateral deviation of the A4 at V21, 1943-06-10
     File  — Box: 13, Folder: 86/132
  
        Dates: 
      1943-06-10
    
  
    
  
Control underpinnings: Uver the levitation of the guide beam plane, 1943-10-20
     File  — Box: 13, Folder: 86/134
  
        Dates: 
      1943-10-20
    
  
    
  
New Basic Investigations on Lateral Steering Control by Guide Beam, 1946-05-16
     File  — Box: 13, Folder: 86/137
  
        Dates: 
      1946-05-16
    
  
    
  
Foreign Document Evaluation Branch Ordnance Research and Development Center Aberdeen Proving Ground: External ballistic performance required of homing devices of project "Wasserfall", 1948-08
     File  — Box: 13, Folder: 86/139
  
        Dates: 
      1948-08
    
  
    
  
Control subdivisions: Freder-coupled gravity pendulum unit simulation, 1944-02-12
     File  — Box: 13, Folder: 86/141
  
        Dates: 
      1944-02-12
    
  
    
  
Control underpinnings: Aggregate control with reversing pointer, 1943-12
     File  — Box: 13, Folder: 86/142
  
        Dates: 
      1943-12
    
  
    
  
Control Operations: On the Question of Stick Assignment, 1944-03-16
     File  — Box: 13, Folder: 86/145
  
        Dates: 
      1944-03-16
    
  
    
  
Control investigations: Areas of effect of anti-aircraft missiles, 1944-03-21
     File  — Box: 13, Folder: 86/146
  
        Dates: 
      1944-03-21
    
  
    
  
