Box 16
     Container 
  
Contains 66 Results:
Adjustment of the ready-to-run unit in relation to the target firing level, 1941-10-04
     File  — Box: 16, Folder: 115/07
  
        Dates: 
      1941-10-04
    
  
    
  
Wessungen at the magnetic Vestarker according to Prof. Buchhold, 1941-12-12
     File  — Box: 16, Folder: 115/08
  
        Dates: 
      1941-12-12
    
  
    
  
For overlaying the far fields of omnidirectional radiators or dipoles, 1942-01-05
     File  — Box: 16, Folder: 115/09
  
        Dates: 
      1942-01-05
    
  
    
  
Test report on the L.G.W. developed vertical, 1941-11-06
     File  — Box: 16, Folder: 115/10
  
        Dates: 
      1941-11-06
    
  
    
  
The staying power of the newly developed Anschautz vertical compared to the Siemens vertical, 1942-02-25
     File  — Box: 16, Folder: 115/11
  
        Dates: 
      1942-02-25
    
  
    
  
Siemens course gyroscope as guide for the control of the unit, 1942-04-09
     File  — Box: 16, Folder: 115/14
  
        Dates: 
      1942-04-09
    
  
    
  
Calibration of the mechanical beacon model, 1942-06-19
     File  — Box: 16, Folder: 115/17
  
        Dates: 
      1942-06-19
    
  
    
  
The 80 cm cal. R (rocket)-projectile with a useful load of one ton and a range of over 160 km, 1943-01-25
     File  — Box: 16, Folder: 115/20
  
        Dates: 
      1943-01-25
    
  
    
  
Addendum to Report No.20 (The 80 cm R projectile with a tonne payload and a range of over 160 km)., 1943-01-29
     File  — Box: 16, Folder: 115/21
  
        Dates: 
      1943-01-29
    
  
    
  
