Object 68/41 - 70/3
Container
Contains 19 Results:
Part C: Tactical use of the Flak-R, structure of battery positions and supply issues, 1943-04-30
File — Object: 68/41 - 70/3, Folder: Arch 68/41
Dates:
1943-04-30
Part D: Pictures and lists for part C. Tactical use of the Flak-R. Construction of battery positions and supply issues
File — Object: 68/41 - 70/3, Folder: Arch 68/41 (Attachment)
Dates:
1920 - 1970
Mechanical and tactical performance of the aggregate C2 based on the 1st draft report
File — Object: 68/41 - 70/3, Folder: Arch 60/42
Dates:
1920 - 1970
Performance of the aggregate C2 8/45 based on the aerodynamic coefficients of the reports archive no. 66/1441), 1943-07-19
File — Object: 68/41 - 70/3, Folder: Arch 68/45
Dates:
1943-07-19
2 preliminary projects for C2 - evening double-stage anti-aircraft missiles, 1944-02-17
File — Object: 68/41 - 70/3, Folder: Arch 68/47
Dates:
1944-02-17
Tuning of Waterfall Test Devices, 1944-03-16
File — Object: 68/41 - 70/3, Folder: Arch 68/48
Dates:
1944-03-16
Radiation stress corrosion for the M-tank, 1944-04-06
File — Object: 68/41 - 70/3, Folder: Arch 68/49 (Copy)
Dates:
1944-04-06
Evaluation of the shot of the device "Waterfall" V1, 2. This report includes 7 sheets of text and 6 diagrams, 1944-05-01
File — Object: 68/41 - 70/3, Folder: Arch 68/50 (Copy)
Dates:
1944-05-01
Trajectory of the aggregate C 2 8/45 as a fin projectile and as a glider, 1944-05-15
File — Object: 68/41 - 70/3, Folder: Arch 68/51 (Copy)
Dates:
1944-05-15
Acceleration, demand pressures and mixing ratio for the "Waterfall" device, viewed over the drive track. Corrections in voting, 1944-06-06
File — Object: 68/41 - 70/3, Folder: Arch 68/52 (Copy)
Dates:
1944-06-06