Object 71/1 - 72/43
     Container 
  
Contains 40 Results:
Verification of the strength of the tip spars when subjected to stress from vibrations and omission of frame 1, 1940-02-23
     File  — Object: 71/1 - 72/43, Folder: Arch 72/4 (Copy)
  
        Dates: 
      1940-02-23
    
  
    
  
Static calculation of the support structure of a starting aid for 1000 kg thrust (HVP smoker B8), 1940-02-22
     File  — Object: 71/1 - 72/43, Folder: Arch 72/5 (Copy)
  
        Dates: 
      1940-02-22
    
  
    
  
Static calculation of shell A4. A. Specification and choice of construction, 1940-05-15
     File  — Object: 71/1 - 72/43, Folder: Arch 72/7
  
        Dates: 
      1940-05-15
    
  
    
  
Secret commando operation. Static calculation of the erection device for the test vehicle, 1940-02-29
     File  — Object: 71/1 - 72/43, Folder: Arch 72/8
  
        Dates: 
      1940-02-29
    
  
    
  
Secret. Static control of the hood of the Siemens control unit, 1940-01-13
     File  — Object: 71/1 - 72/43, Folder: Arch 72/9
  
        Dates: 
      1940-01-13
    
  
    
  
Buckling tests on V-profiles with and without brim
     File  — Object: 71/1 - 72/43, Folder: Arch 72/12
  
        Dates: 
      1920 - 1970
    
  
    
  
Static calculation of shell A4. B. Design loads for the hull, 1940-08-26
     File  — Object: 71/1 - 72/43, Folder: Arch 72/13
  
        Dates: 
      1940-08-26
    
  
    
  
Examination of thin-wooded containers, 1941-09-15
     File  — Object: 71/1 - 72/43, Folder: Arch 72/15
  
        Dates: 
      1941-09-15
    
  
    
  
Replacement of economy materials in A4 fuel tanks, 1941-10-01
     File  — Object: 71/1 - 72/43, Folder: Arch 72/16
  
        Dates: 
      1941-10-01
    
  
    
  
Overview of the existing options for converting unit 4 to replacement materials, with the additional work resulting from this, 1942-01-30
     File  — Object: 71/1 - 72/43, Folder: Arch 72/17
  
        Dates: 
      1942-01-30
    
  
    
  
