Object 71/1 - 72/43
Container
Contains 40 Results:
Verification of the strength of the tip spars when subjected to stress from vibrations and omission of frame 1, 1940-02-23
File — Object: 71/1 - 72/43, Folder: Arch 72/4 (Copy)
Dates:
1940-02-23
Static calculation of the support structure of a starting aid for 1000 kg thrust (HVP smoker B8), 1940-02-22
File — Object: 71/1 - 72/43, Folder: Arch 72/5 (Copy)
Dates:
1940-02-22
Static calculation of shell A4. A. Specification and choice of construction, 1940-05-15
File — Object: 71/1 - 72/43, Folder: Arch 72/7
Dates:
1940-05-15
Secret commando operation. Static calculation of the erection device for the test vehicle, 1940-02-29
File — Object: 71/1 - 72/43, Folder: Arch 72/8
Dates:
1940-02-29
Secret. Static control of the hood of the Siemens control unit, 1940-01-13
File — Object: 71/1 - 72/43, Folder: Arch 72/9
Dates:
1940-01-13
Buckling tests on V-profiles with and without brim
File — Object: 71/1 - 72/43, Folder: Arch 72/12
Dates:
1920 - 1970
Static calculation of shell A4. B. Design loads for the hull, 1940-08-26
File — Object: 71/1 - 72/43, Folder: Arch 72/13
Dates:
1940-08-26
Examination of thin-wooded containers, 1941-09-15
File — Object: 71/1 - 72/43, Folder: Arch 72/15
Dates:
1941-09-15
Replacement of economy materials in A4 fuel tanks, 1941-10-01
File — Object: 71/1 - 72/43, Folder: Arch 72/16
Dates:
1941-10-01
Overview of the existing options for converting unit 4 to replacement materials, with the additional work resulting from this, 1942-01-30
File — Object: 71/1 - 72/43, Folder: Arch 72/17
Dates:
1942-01-30