Object 71/1 - 72/43
Container
Contains 40 Results:
Calculation of the 02 and fuel tanks of the A4 based on changes in the unit. Calculation of the brackets, 1941-08-20
File — Object: 71/1 - 72/43, Folder: Arch 72/20
Dates:
1941-08-20
Middle part A4 with rope Calculation of the reinforcement, 1941-08-29
File — Object: 71/1 - 72/43, Folder: Arch 72/21
Dates:
1941-08-29
Static calculation and static control of the corset for A4, 1941-11-13
File — Object: 71/1 - 72/43, Folder: Arch 72/22
Dates:
1941-11-13
Static calculation of the construction of the corset to the A4, 1942-02-23
File — Object: 71/1 - 72/43, Folder: Arch 72/24
Dates:
1942-02-23
Investigation results on the effect of the spring restraint forces for the individual test benches in relation to the stress on the central part, 1943-06-26
File — Object: 71/1 - 72/43, Folder: Arch 72/25
Dates:
1943-06-26
Own mixture Centers of gravity and bearing pressures from A4 for various equipment and storage options, 1943-07-03
File — Object: 71/1 - 72/43, Folder: Arch 72/26 (Copy)
Dates:
1943-07-03
Stability of the lying device when transported outdoors, storage on a small transport trolley with a 600 mm track, 1943-10-14
File — Object: 71/1 - 72/43, Folder: Arch 72/28
Dates:
1943-10-14
Determination of the actual load parameters of A4 in flight
File — Object: 71/1 - 72/43, Folder: Arch 72/29
Dates:
1920 - 1970
Longitudinal and normal force - as well as bending moment distribution of the A4 in flight, 1944-03-07
File — Object: 71/1 - 72/43, Folder: Arch 72/30
Dates:
1944-03-07
Report on the business trip from February 12th, 1944 to February 19th, 1944 according to MW, 1944-02-24
File — Object: 71/1 - 72/43, Folder: Arch 72/31
Dates:
1944-02-24